# Enhancements Tracking and Backlog

Enhancement tracking repository for OpenShift, including OKD and OCP.

Inspired by the [Kubernetes enhancement](https://github.com/kubernetes/enhancements) process.

This repository provides a rally point to discuss, debate, and reach consensus
for how OpenShift [enhancements](./enhancements) are introduced. OpenShift combines
Kubernetes container orchestration services with a broad set of ecosystem
components in order to provide an enterprise ready Kubernetes distribution built
for extension. OpenShift assembles innovation across a wide array of repositories and
upstream communities. Given the breadth of the distribution, it is useful to
have a centralized place to describe OpenShift enhancements via an actionable design
proposal.

Enhancements may take multiple releases to ultimately complete and thus provide
the basis of a community roadmap. Enhancements may be filed from anyone in the
community, but require consensus from domain specific project maintainers in
order to implement and accept into the release.

For an overview of the whole project, see [the roadmap](ROADMAP.md).

For a quick-start, FAQ, and template references, see [the guidelines](guidelines/README.md).

## Why are Enhancements Tracked?

As the project evolves, its important that the OpenShift community understands how we
build, test, and document our work. Individually it is hard to understand how
all parts of the system interact, but as a community we can lean on each other
to build the right design and approach before getting too deep into an
implementation.

## Is My Thing an Enhancement?

A rough heuristic for an enhancement is anything that:

- impacts how a cluster is operated including addition or removal of significant
capabilities
- impacts upgrade/downgrade
- needs significant effort to complete
- requires consensus/code across multiple domains/repositories
- proposes adding a new user-facing component
- has phases of maturity (Dev Preview, Tech Preview, GA)
- demands formal documentation to utilize

It is unlikely to require an enhancement if it:

- fixes a bug
- adds more testing
- internally refactors a code or component only visible to that components
domain
- minimal impact to distribution as a whole

If you are not sure if the proposed work requires an enhancement, file an issue
and ask!

## When to Create a New Enhancement

Enhancements should be related to work to be implemented in the near
future. If you have an idea, but aren't planning to implement it right
away, the conversation should start somewhere else like the mailing
list or Slack.

Create an enhancement here once you:

- have circulated your idea to see if there is interest
- (optionally) have done a prototype in your own fork
- have identified people who agree to work on and maintain the enhancement
- many enhancements will take several releases to complete

Although you should probably not start your new idea's journey by writing an
enhancement up front, it's worth perusing [the enhancement template](guidelines/enhancement_template.md) to understand the
kinds of details that will ultimately be required, so you can keep them in mind as
you explore your new idea.

## How are Enhancements Reviewed and Approved?

The author of an enhancement is responsible for managing it through
the review and approval process, including soliciting feedback on the pull request
and in meetings, if necessary.

Each enhancement should have at least one "approver" and several
reviewers designated in the header of the document.

The approver assists authors who may not be familiar with the process,
the project, or the maintainers. They may provide advice about who
should review a specific proposal and point out deadlines or other
time-based criteria for completing work. The approver is responsible
for recognizing when consensus among reviewers has been reached so that a proposal is
ready to be approved, or formally rejected. In cases where consensus
is not emerging on its own, the approver may also step in as a
mediator. The approver does not need to be a subject-matter expert for
the subject of the design, although it can help if they are.

Choosing the appropriate approver depends on the scope of an
enhancement. If it is limited in scope to a given team or component,
then a peer or lead on that team or pillar is appropriate. If an
enhancement captures something more broad in scope, then a member of
the OpenShift staff engineers team or someone they delegate would be
appropriate. Examples of broad scope are proposals that change the
definition of OpenShift in some way, add a new required dependency, or
change the way customers are supported. Use your best judgement to
determine the level of approval needed. If you’re not sure, ask a
staff engineer to help find a good approver by posting in
`#forum-arch` on the RedHat Slack server and tagging
`@aos-staff-engineers`. If you are external to RedHat, you can use the
`#openshift-users` forum on the kubernetes.slack.com instance.

The set of reviewers for an enhancement proposal can be anyone that
has an interest in this work or the expertise to provide a useful
input/assessment. At a minimum, the reviewers must include a
representative of any team that will need to do work for this EP, or
whose team will own/support the resulting implementation. Be mindful
of the workload of reviewers, however, and the challenge of finding
consensus as the group of reviewers grows larger. Clearly indicating
what aspect of the EP you expect each reviewer to be concerned with
will allow them to focus their reviews.

## How Can an Author Help Speed Up the Review Process?

Enhancements should have agreement from all stakeholders prior to
being approved and merged. Reviews are not time-boxed (see Life-cycle
below). We manage the rate of churn in OpenShift by asking component
maintainers to act as reviewers in addition to everything else that
they do. If it is not possible to attract the attention of enough of
the right maintainers to act as reviewers, that is a signal that the
project's rate of change is maxed out. With that said, there are a few
things that authors can do to help keep the conversation moving along.

1. Respond to comments quickly, so that a reviewer can tell you are
engaged.
2. Push update patches, rather than force-pushing a replacement, to
make it easier for reviewers to see what you have changed. Use
descriptive commit messages on those updates, or plan to use
`/label tide/merge-method-squash` to have them squashed when the
pull request merges.
3. Do not rely solely on the enhancement for visibility of the
proposal. For high priority work, or if the conversation stalls
out, you can start a thread in `#forum-arch` on the CoreOS Slack
server or bring the enhancement to one of the weekly architecture
review meetings for discussion. If you aren't sure which meeting to
use, work with a staff engineer to find a good fit.
4. If the conversation otherwise seems stuck, pinging reviewers on
Slack can be used to remind them to look at updates. It's generally
appropriate to give people at least a business day or two to
respond in the GitHub thread first, before reaching out to them
directly on Slack, so that they can manage their work queue and
disruptions.

## Using Labels

The following labels may be applied to enhancements to help categorize them:

- `priority/important-soon` indicates that the enhancement is related to a
top level release priority. These will be highlighted in the
[this-week](this-week/) newsletters.

## Life-cycle

Pull requests to this repository should be short-lived and merged as
soon as there is consensus. Therefore, the normal life-cycle timeouts
are shorter than for most of our code repositories.

Pull requests being actively discussed will stay open
indefinitely. Inactive pull requests will automatically have the
`life-cycle/stale` label applied after 28 days. Removing the
life-cycle label will reset the clock. After 7 days, stale pull
requests are updated to `life-cycle/rotten`. After another 7 days,
rotten pull requests are closed.

Ideally pull requests with enhancement proposals will be merged before
significant coding work begins, since this avoids having to rework the
implementation if the design changes as well as arguing in favor of
accepting a design simply because it is already implemented.

## Template Updates

From time to time the template for enhancement proposals is modified
as we refine our processes. When that happens, open pull requests may
start failing the linter job that ensures that all documents include
the required sections.

If you are working on an enhancement and the linter job fails because
of changes to the template (not other issues with the markdown
formatting), handle it based on the maturity of the enhancement pull
request:

* If the only reason to update your pull request is to make the linter job
accept it after a template change and there are no substantive
content changes needed for approval, override the job to allow the
pull request to merge.
* If your enhancement is still a draft, and consensus hasn't been
reached, modify the pull request so the new enhancement matches the updated
template.
* If you are updating an existing (merged) document, go ahead and
override the job.